Houghton Lake Seawall and Boat Well

Houghton Lake Seawall and Boat Well

This project on Houghton Lake included the removal and replacement of an old wall with a new 2 foot seawall.

We constructed a 10×16 foot boat well along with a 3 foot boardwalk for ease of access.

Afterwards, topsoil backfill with grass seed was added.

Back to Job Gallery
Back to Job Gallery
Get A Quote
Get A Quote
2019-04-04T14:19:29-04:00